PEDESTRIAN OVERFLOW OVER “TRAPEZITSA” INTERSECTION – CITY OF BURGAS

In 2015 “Team 5” company built the emblematic pedestrian overpass in the city of Burgas. A massive footbridge over the busy roundabout at Trapezitsa Square. Including fabrication, delivery and installation of the metal structure for the bridge structure and its adjacent architectural details. It is as light and elegant as possible – the bridges are […]

PEDESTRIAN ACCESS TO HOTEL MIRAGE

Implementation of metal elements according to the architectural part of a newly built pedestrian overpass at a roundabout at the Mirage Hotel, including handrails, aluminum panels with embedded aluminum average sheet metal, aluminum handrails and metal handrails on the stairs, as well as a structural polycarbonate roof.

MOTO PFOE CAR SHOWROOM AND SERVICE CENTER – BURGAS

The company “Team 5” Ltd. carried out repair and restoration works of the “Burgauto” car showroom in all parts – construction, plumbing, electricity, low-current installations, gasification, HVAC, landscape – sidewalks, fences, approaches.

AMILUM BULGARIA EAD

“Shop for the production and packaging of crystalline dextrose” on the territory of the factory of “Amilum Bulgaria” EAD in the city of Razgrad – construction and installation of metal construction for the “Packaging” and “Production” workshops; Installation of technological equipment.

WASTEWATER TREATMENT PLANT – VARNA

The company “Team 5” Ltd. carried out demolition of reinforced concrete tanks and dismantling of metal structures. Subsequent installation of technological equipment, tanks, pipelines, electrical and instrumentation installation on the territory of the WASTEWATER TREATMENT PLANT – Varna 

“TECHNOMARKET” – Burgas City

Refurbishment of building materials hall from Mr Bricolage shopping center into Technomarket – Burgas store. Turnkey construction, including construction part – installation of load-bearing metal structures, cladding panels, partition walls, finishing works, internal electrical installations and external low-voltage cable power supply, tests, start-up and commissioning. 

LUKOIL NEFTOKHIM BURGAS AD

The company “Team 5” Ltd. carried out the construction of installations for the hydrotreatment of gasoline and diesel fuel on the territory of Lukoil Neftohim Burgas AD. Together with “AKTOR” – Greece and “Atomenergomontazh” – Ruse, “Team -5” Ltd. is working on the construction of installations for hydrotreatment of gasoline and diesel fuel on the […]