Scientific research and production complex – Burgas city

The company “EKIP 5” Ltd. realizes the construction, as the main contractor, until commissioning, covering a wide range of activities, including: construction of steel structures, electrical installations, HVAC systems, plumbing installations, facades, finishing works and vertical planning.
CONSTRUCTION OF A PLANETARIUM ON THE TERRITORY OF THE PORT OF BURGAS, EAST TERMINAL
High-tech complex for digitization and data storage – town of Bulgarovo
Design and construction of the awning – “Oasis Lozenets”
CONSTRUCTION OF A PIPELINE OVERHEAD

The flyover is of a mixed type of reinforced concrete and steel structure. The entire facility has a total length of 143 meters.
CONSTRUCTION OF A PIPELINE OVERHEAD

Due to its hard-to-reach location and limited working space on site, we built this pipeline trestle using the block assembly method. The main support structure is of precast reinforced concrete and the steel structure of individual modules with pipelines installed in each individual module. This was done in factory conditions, with the finished modules being […]
CONSTRUCTION OF A PIPELINE OVERHEAD

Due to the fact that the facility under construction is located in a working factory, we decided to make the reinforced concrete structure from precast reinforced concrete. In this way, we significantly reduced the working time on the site. The steel structure is made entirely by welding individual modules, in factory conditions, from axle to […]
CONSTRUCTION OF A PIPELINE OVERHEAD

Due to the fact that the facility under construction is located in a working factory, we decided to make the reinforced concrete structure from precast reinforced concrete. In this way, we significantly reduced the working time on the site. The steel structure is made entirely by welding individual modules from axle to axle. As each […]
CONSTRUCTION OF A RANGE FOR RESCUE EQUIPMENT “N. J. VAPTSAROV”

The construction is a steel platform imitating the deck of a ship, with mounted on it: The platform me
VVMU-N.Y.VAPTSAROV, VARNA

The company “Team 5” Ltd. carried out reconstruction of an existing heating installation of a cadet building, a student dormitory and a sports complex located on the territory of VVMU-N.Y.Vaptsarov, Varna – manufacturing and installation of electrical and control systems in connection with management of heating installations.