CONSTRUCTION OF A PIPELINE OVERHEAD

Due to the fact that the facility under construction is located in a working factory, we decided to make the reinforced concrete structure from precast reinforced concrete. In this way, we significantly reduced the working time on the site. The steel structure is made entirely by welding individual modules, in factory conditions, from axle to axle. After that, the individual modules were transported to the site. Within one day, we installed up to two wheelbases, 12 meters each. The entire facility has a total length of 162 meters.