CONSTRUCTION OF A PIPELINE OVERHEAD

Due to its hard-to-reach location and limited working space on site, we built this pipeline trestle using the block assembly method. The main support structure is of precast reinforced concrete and the steel structure of individual modules with pipelines installed in each individual module. This was done in factory conditions, with the finished modules being transported to the site. This significantly eased the work on the site and saved us a lot of time. The entire facility has a total length of 66 meters.