CONSTRUCTION OF A PIPELINE OVERHEAD

Due to the fact that the facility under construction is located in a working factory, we decided to make the reinforced concrete structure from precast reinforced concrete. In this way, we significantly reduced the working time on the site. The steel structure is made entirely by welding individual modules from axle to axle. As each module has pre-installed electric grills. The entire facility has a total length of 24 meters.